Project Facts

Client: Balfour Beatty
Sector: Education, Refurbishment
Project Value: 1.5M
Start Date: January 2013
Duration: 18 Months

Overview

After successfully working alongside Balfour Beatty at Midhurst Rother College PP Construction were asked to assist at Magna Academy, Poole after Balfour Beatty were let down by their previous contractor. The main works included the complete refurbishment of the existing school, an extension and considerable external works. As such careful co-ordination was required with other key contractors to ensure that the works were carried out as safely as possible.

Scope of Works

Initially PP Construction were contracted to carry out £400k of internal drainage and forming of pad foundations in order to ensure Balfour Beatty’s constricted programme was not delayed. Once these works were nearing completion additional works were negotiated and carried out to a total value of 1.5M. These works included ground and first floor in-situ concrete slabs, additional internal and external drainage, service installation, external works and the forming of a highly specified paved amphitheatre.

 

Get In Touch

We are happy to answer any questions that you may have at any time please do not hesitate in contacting our friendly staff today:

0118 988 7211

Accreditations

plant hire accreditations

Easy access to the M4 & M3 corridors gives us the ability to easily service the South East of England.